Bridge Project at Stub Stewart, Saturday 2/18/17, 8:45 AM.
Volunteers are needed –With 50-60 volunteers, we can finish this project (i.e., two bridges) and reopen the Link’n’Pin trail.

Finishing this project will be a major accomplishment for the MTB area at Stub Stewart.

Thanks to the efforts of Dan Katten, Joe Rykowski, and the Park Rangers rock has been staged close to the bridges sites.

Scope of work for Saturday:

  • Transport the rock down to the bridges
  • Assemble, position, and fill the gabion (i.e. cages that hold rock)
  • Realign the trail to match the bridge approaches

This is a BIG task and we will be working on TWO bridges (at two different locations).

***We will create TWO trail teams.  To plan the logistics for the day we are asking that people SIGN UP.
People who SIGN UP will be emailed updates about the project, your team assignment, and your team meeting location.

BONUS ITEMS:
We have sponsors!  Thus we will have a BBQ social and swag raffle following the trail work

Carpool option available:  Fat Tire Farm has volunteered to use their vans to transport volunteers from their Portland shop
Want a ride?  Email Barry to reserve your seat.  barry@fattirefarm.com
Carpool meeting time: 7:15 AM at FTF’s shop; 2714 NW Thurman St, Portland, OR 97210

Tools provided.  Bring weather appropriate clothing/gear.

SIGN UP NOW

https://goo.gl/forms/YCJeoWYGGobaar4H2

Team list, action plan, and meeting location will be emailed to people who sign up.

Thanks for your support!!!

 

 

 

 

       

 

Register

https://goo.gl/forms/YCJeoWYGGobaar4H2