BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Northwest Trail Alliance - ECPv6.15.18//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Northwest Trail Alliance
X-ORIGINAL-URL:https://nw-trail.org
X-WR-CALDESC:Events for Northwest Trail Alliance
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Los_Angeles
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20200308T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20201101T090000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20210314T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20211107T090000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20220313T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20221106T090000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Los_Angeles:20210502T090000
DTEND;TZID=America/Los_Angeles:20210502T140000
DTSTAMP:20260430T160535
CREATED:20210406T232012Z
LAST-MODIFIED:20210406T232015Z
UID:23496-1619946000-1619964000@nw-trail.org
SUMMARY:STUB STEWART – PROJECT #2
DESCRIPTION:TRAIL WORK (in the Freerider area) Our Mission is to transform the Rinse & Repeat trail into a downhill trail.  Specifically\, changing it from a multi-directional trail to become a BLUE downhill-only trail. This modification will create a continuous descent from the top of the freeride area to the bottom of Lower Green Horn.  This trail modification is part of a larger plan which includes creating a NEW Black trail in the future (see map)Our goal is to complete this trail modification in just TWO trail projects so we can reopen the trail quickly. To accomplish this goal we help. \n\n\n\n\nsign up\n\n\n\n\n\n\n\n\nLarge trail project #1 Sunday\, April 18th \n\n\n\nChange Rinse & Repeat to a downhill trail and connect with Lower Green HornRemove scrap woodpile (with the help of the Park Ranger vehicle)\n\n\n\nLarge trail project #2 with multiple 6-person crews Sunday\, May 2nd \n\n\n\nReshape Rinse & Repeat large corners to be consistent with a downhill trail
URL:https://nw-trail.org/event/stub-stewart-project-2/
CATEGORIES:LL Stub Stewart,Trail Work
ATTACH;FMTTYPE=image/png:https://nw-trail.org/wp-content/uploads/2020/04/screenshot_4217-dQev1C.tmp_.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Los_Angeles:20210508T093000
DTEND;TZID=America/Los_Angeles:20210508T140000
DTSTAMP:20260430T160535
CREATED:20210430T175802Z
LAST-MODIFIED:20210430T180938Z
UID:23723-1620466200-1620482400@nw-trail.org
SUMMARY:Eichler Bike Park Maintenance Day 5/8
DESCRIPTION:When: Saturday May 8th 9:30am – 2pm \n\n\n\nWhere: Eichler Park 13710 SW Farmington Road Beaverton OR 97005 \n\n\n\nOur goal is to build a community that wants to create a better pump track for all riders. \n\n\n\nPlease Fill out these two waivers: \n\n\n\nPLEASE SIGN COVID WAIVER : http://nw-trail.org/covidwaiver \n\n\n\nPLEASE SIGN THPRD WAIVER: https://www.volgistics.com/ex/portal.dll/ap?AP=1862991094&OR=1 \n\n\n\n\nregister here\n\n\n\n\nDue to COVID – 19\, we are strictly limiting the number of volunteers. We NEED you to pre-register & sign the online waiver before the event. Day of & non-pre-registered volunteers will be turned away. We have mandatory guidelines for facial coverings and social distancing measures that need to be followed. This will be shared with your registration confirmation. Please understand that this is not only for your safety but for the safety of our entire community. \n\n\n\nTool needs: \n\n\n\nPlease bring the following if you have them: \n\n\n\nFlat/Transfer Shovel \n\n\n\nMcLeods \n\n\n\nTampers \n\n\n\nWhat to wear: \n\n\n\nFace Covering as recommended by the CDC \n\n\n\n– Work clothes: Light long sleeve shirt\, Long Pants (no shorts)\, Boots\, Gloves\, Eye Protection & Gloves \n\n\n\n– Jacket (be prepared) \n\n\n\n– Hard hat or bike helmet (mandatory) \n\n\n\nPlease be on time or early. We work in all weather so come prepared for the elements whatever they may be (and change of clothes in the car for when we finish). \n\n\n\nDue to COVID-19 you are responsible for bringing all of your own food and beverages for the event. \n\n\n\nWe plan on working every Saturday in May to get the track ready for the season. Questions? Email EichlerPark@nw-trail.org
URL:https://nw-trail.org/event/eichler-bike-park-maintenance-day-5-8/
CATEGORIES:Trail Work
ATTACH;FMTTYPE=image/png:https://nw-trail.org/wp-content/uploads/2021/04/Screen-Shot-2021-04-23-at-12.30.01-PM.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Los_Angeles:20210515T093000
DTEND;TZID=America/Los_Angeles:20210515T140000
DTSTAMP:20260430T160535
CREATED:20210507T205459Z
LAST-MODIFIED:20210507T205502Z
UID:23740-1621071000-1621087200@nw-trail.org
SUMMARY:Eichler Bike Park Maintenance Day 5/15
DESCRIPTION:When: Saturday May 15th 9:30am – 2pm \n\n\n\nWhere: Eichler Park 13710 SW Farmington Road Beaverton OR 97005 \n\n\n\nOur goal is to build a community that wants to create a better pump track for all riders. \n\n\n\nPlease Fill out these two waivers: \n\n\n\nPLEASE SIGN COVID WAIVER : http://nw-trail.org/covidwaiver \n\n\n\nPLEASE SIGN THPRD WAIVER: https://www.volgistics.com/ex/portal.dll/ap?AP=1862991094&OR=1 \n\n\n\n\nregister here\n\n\n\n\nDue to COVID – 19\, we are strictly limiting the number of volunteers. We NEED you to pre-register & sign the online waiver before the event. Day of & non-pre-registered volunteers will be turned away. We have mandatory guidelines for facial coverings and social distancing measures that need to be followed. This will be shared with your registration confirmation. Please understand that this is not only for your safety but for the safety of our entire community. \n\n\n\nTool needs: \n\n\n\nPlease bring the following if you have them: \n\n\n\nFlat/Transfer Shovel \n\n\n\nMcLeods \n\n\n\nTampers \n\n\n\nWhat to wear: \n\n\n\nFace Covering as recommended by the CDC \n\n\n\n– Work clothes: Light long sleeve shirt\, Long Pants (no shorts)\, Boots\, Gloves\, Eye Protection & Gloves \n\n\n\n– Jacket (be prepared) \n\n\n\n– Hard hat or bike helmet (mandatory) \n\n\n\nPlease be on time or early. We work in all weather so come prepared for the elements whatever they may be (and change of clothes in the car for when we finish). \n\n\n\nDue to COVID-19 you are responsible for bringing all of your own food and beverages for the event. \n\n\n\nWe plan on working every Saturday in May to get the track ready for the season. Questions? Email EichlerPark@nw-trail.org
URL:https://nw-trail.org/event/eichler-bike-park-maintenance-day-5-15/
CATEGORIES:Trail Work
ATTACH;FMTTYPE=image/jpeg:https://nw-trail.org/wp-content/uploads/2021/05/IMG_0845.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Los_Angeles:20210522T090000
DTEND;TZID=America/Los_Angeles:20210522T133000
DTSTAMP:20260430T160535
CREATED:20210512T193251Z
LAST-MODIFIED:20210513T172719Z
UID:23755-1621674000-1621690200@nw-trail.org
SUMMARY:SICKTER LARS LOOP IN TILLAMOOK STATE FOREST 5/22
DESCRIPTION:Please join us on Saturday\, May 22nd at 9 AM in the beautiful Tillamook State Forest to clear brush along Sickter Lars Loop. \n\n\n\nAbout this Event\n\n\n\nOur primary focus will be removing ferns\, salal\, Oregon grape\, and salmonberry from the edges of the trail. A majority of our work will be completed with rakes\, loppers & pruning shears. Should be a great day out in the woods! \n\n\n\nPLEASE SIGN COVID WAIVER : http://nw-trail.org/covidwaiver \n\n\n\n\nregister here\n\n\n\n\nDue to COVID – 19\, we are strictly limiting the number of volunteers. We NEED you to pre-register & sign the online waiver before the event. Day of & non-pre-registered volunteers will be turned away. We have mandatory guidelines for facial coverings and social distancing measures that need to be followed. This will be shared with your registration confirmation. Please understand that this is not only for your safety but for the safety of our entire community. \n\n\n\nWhat to wear: \n\n\n\nFace Covering as recommended by the CDC \n\n\n\n– Work clothes: Light long sleeve shirt\, Long Pants (no shorts)\, Boots\, Gloves\, Eye Protection & Gloves \n\n\n\n– Jacket (be prepared) \n\n\n\n– Hard hat or bike helmet (mandatory) \n\n\n\nPlease be on time or early. We work in all weather so come prepared for the elements whatever they may be (and change of clothes in the car for when we finish). \n\n\n\nDue to COVID-19 you are responsible for bringing all of your own food and beverages for the event. \n\n\n\nCome help bring this mountain bike-specific trail back to life. Any questions? Please email timm@nw-trail.org
URL:https://nw-trail.org/event/sickter-lars-loop-in-tillamook-state-forest-5-22/
CATEGORIES:Tillamook State Forest,Trail Work
ATTACH;FMTTYPE=image/jpeg:https://nw-trail.org/wp-content/uploads/2021/05/20210508_114359.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Los_Angeles:20210523T090000
DTEND;TZID=America/Los_Angeles:20210523T140000
DTSTAMP:20260430T160535
CREATED:20210506T145348Z
LAST-MODIFIED:20210511T215306Z
UID:23736-1621760400-1621778400@nw-trail.org
SUMMARY:Sandy Ridge Trail day 5/23
DESCRIPTION:Join us on Sunday\, May 23rd at Sandy Ridge Trail System to get the trails in shape for more riding! We will be doing two groups of 10 and offsetting the start time to keep participants safe. Please register for an A or B time slot\, group A which starts at 9:00 and group B starting at 9:30. Trail work will last approximately 4 hours wrapping up at 2:00 (A group) and 2:30 (B group) \n\n\n\nPLEASE SIGN WAIVER IN CONFIRMATION EMAIL \n\n\n\nDue to COVID – 19\, we are strictly limiting the number of volunteers. We NEED you to pre-register & sign the online waiver before the event. Day of & non-pre-registered volunteers will be turned away. We have mandatory guidelines for facial coverings and social distancing measures that need to be followed. This will be shared with your registration confirmation. Please understand that this is not only for your safety but for the safety of our entire community. \n\n\n\n\ngroup a registration\n\n\n\n\n\ngroup B registration\n\n\n\n\nWhat to wear: \n\n\n\nFace Covering as recommended by the CDC \n\n\n\n– Work clothes: Light long sleeve shirt\, Long Pants (no shorts)\, Boots\, Gloves (bring extra pairs to change into dry gloves)\, Eye Protection \n\n\n\n– Jacket (be prepared for rain and cold weather) \n\n\n\n– Hard hat or bike helmet (mandatory) \n\n\n\nWhat to Bring: \n\n\n\n– Water \n\n\n\n– Snacks \n\n\n\n– Favorite trail tool\, McLeod or Rogue hoe \n\n\n\n– Optional: Folding hand saw \n\n\n\nPlease be on time or early. Arrive 15-20 minutes prior to start time. We work in all weather so come prepared for the elements whatever they may be (and change of clothes in the car for when we finish). \n\n\n\nDue to COVID-19 you are responsible for bringing all of your own food and beverages for the event. We have tools on site but if you are more comfortable with your own please feel free to bring your own. We will tackle a range of maintenance and building projects and the project will change from week to week. \n\n\n\nSunday May 23rd\, 2020 / 9:00 am – 2 pm / Sandy Ridge Trails \n\n\n\nPlease email SandyRidge@NW-trail.org with any questions
URL:https://nw-trail.org/event/sandy-ridge-trail-day/
CATEGORIES:Sandy Ridge,Trail Work
ATTACH;FMTTYPE=image/jpeg:https://nw-trail.org/wp-content/uploads/2021/03/DSC05868-2.jpg
END:VEVENT
END:VCALENDAR