Please be advised that forestry activity at Rocky Point will affect trail access effective immediately and until further notice. Be cautious of trucks entering and leaving the North gate.
North Side Rocky Point
Active logging will take place effective immediately and until further notice. All trails on the North side will be closed with the exception of Andyland and RP United. Furthermore, both of these trails are restricted to out-and-back riding with a single road crossing for Andyland, and only to the top of Andyland summit. Log hauling traffic is expected to increase throughout August and continue into the fall. See maps below for trail closure and additional traffic safety information.
South Side Rocky Point
Active herbicide treatment in the Switchblade area is complete effective 8/30/2021. Switchblade, Bucknife, Butterknife climb, as well as the gravel road climb, are now OPEN. See map below.