The Everblades is now open! (mostly)
After an endlessly wet spring, the new Everblades area is ready to open most of the trails. On June 8th, we will be opening the 1.2 mile blue flow/jump trail (Machete), and the 1.2 mile green climb to return (Butter knife). Machete is a flow/jump line with small to medium sized features designed to help riders … Read More