The Pipeline Trail at Rocky Point is Done

Written by Jered Bogli

Update from our work on Saturday 12/21. The Pipeline – aka the ridge, aka the connector is DONE!

Overall the trail now drains 100% better. Segments of the trail were re-routed to help accomplish this, we laid lots of gravel to keep mud off of bikes, built up rollers and pump bumps through the trail to help keep you flowing. In total this trail had 200+ volunteer hours of work to get all the tread and 15 yards of gravel laid in.

HUGE THANKS TO:

Our full crew of volunteers.
METROPOLIS CYCLES for feeding us.

Weekly Saturday Digs at Rocky Point Continue. Join the crew on January 4th. Details and sign ups can be found HERE.

*Rocky Point is property that is leased by NWTA. In order to attend this event (or to access this land) you will need to be a NWTA member, in good standing, as well as sign the online Rocky Point waiver

More details about this property can be found HERE.